Focus Area: Infrastructure (Engineering)
Staff Contact: Mary Jaeger / Nate Baldwin
________________________________________________________________________________
title:
title
Consideration of Supplemental Agreement No. 1 with GFT Infrastructure, Inc. (formerly TranSystems) for design of the Lone Elm Road, 119th Street to Harold, Improvements Project, PN 3-C-040-25.
Body
________________________________________________________________________________
recommended motion:
Approve as part of Consent Agenda.
________________________________________________________________________________
Summary:
The 2027-2031 Capital Improvement Plan included funding in the amount of $16,277,000 for the Lone Elm Road, 119th Street to Harold, Improvements Project, PN 3-C-040-25. This project is needed to address safety and capacity concerns in the area. The project will improve Lone Elm Road from 119th Street to Harold from a 2-lane unimproved roadway to a 2-lane divided arterial section with turn lanes. Improvements will include pavement construction, curb and gutter, medians, streetlights, sidewalk and sidepath, bike lanes, storm sewers, and all other work necessary to complete the project.
A Professional Services Agreement with TranSystems Corporation (now GFT Infrastructure, Inc.) was approved by the City Council on March 18, 2025 in the amount of $995,186.00. The Agreement included survey of existing conditions, utility coordination, public involvement, acquisition documentation (title reports, surveyed exhibits, easement documents, etc.) needed for any right-of-way or easements, development of construction plans in accordance with Olathe design standards and specifications, cost estimates, assistance with bidding the project for construction, and assistance as needed throughout construction.
Supplemental Agreement No. 1 provides for additional services needed to evaluate and incorporate design-speed modifications that will reduce impacts to adjacent residents and utility-relocation reimbursement costs. It will also include work necessary to meet federal requirements associated with the Surface Transportation Block Grant (STBG) award, as well as additional survey and right-of-way documentation, waterline and roundabout design, geotechnical investigation, and other efforts intended to minimize overall project costs. The total cost of Supplemental Agreement No. 1 is $386,211.00, for a total contract value not to exceed $1,341,397.00.
Land acquisition is underway. Utility relocations are anticipated to begin in January 2027 and are expected to be completed by Summer 2027. Construction is anticipated to begin in Fall 2027.
________________________________________________________________________________
Financial Information:
This authorizes Supplemental Agreement No 1 with GFT Infrastructure, Inc. (formerly TranSystems) in an amended amount of $386,211.00 for a total contract value not to exceed $1,341,397.00. Funding for this contract is available from GO Bonds and a federal grant, and is included in the 2027-2031 Capital Improvement Plan.
________________________________________________________________________________
Attachment(s):
A. Project Location Map
B. Project Fact Sheet
C. Supplemental Agreement