File #: G26-5513   
Type: Council Consent Status: Agenda Ready
File created: 1/5/2026 In control: City Council
On agenda: 1/20/2026 Final action:
Title: Consideration of Resolution No. 26-1013 authorizing the 2026 Sidewalk Construction Project, PN 3-C-072-26.
Staff Contact: Mary Jaeger, Nate Baldwin
Attachments: 1. A. Resolution

Focus Area: Infrastructure (Engineering)

Staff Contact: Mary Jaeger / Nate Baldwin

Subject: Authorization of the 2026 Sidewalk Construction Project, PN 3-C-072-26.

________________________________________________________________________________

TITLE:

title

Consideration of Resolution No. 26-1013 authorizing the 2026 Sidewalk Construction Project, PN 3-C-072-26.

Body

________________________________________________________________________________

Summary:

There are missing sidewalk links in older parts of the city, as well as adjacent to schools. The Sidewalk Construction Project is an annual project and will include the construction of new sidewalks that would not be built as part of a street improvement project.

 

Staff has utilized the available walking maps and met with the school district to prioritize the areas adjacent to schools that are missing sidewalk links.  This evaluation took into consideration the number of crossing guards in the area, the percent of students on free or reduced lunches, location of the school and the approximate lineal feet of sidewalk needed.  Based on this information, the area that will be focused on in 2026 for construction of missing segments in the vicinity of Rolling Ridge Elementary.

 

The construction of the sidewalks is tentatively scheduled to begin in Summer 2026.

________________________________________________________________________________

Financial Impact:

Funding for the 2026 Sidewalk Construction Project, as approved in the 2026-2030 Capital Improvement Plan, includes:

                     

                     GO Bonds                                                                                                                                                   $500,000

                     Total                                                                                                                                                                        $500,000

________________________________________________________________________________

Action Needed:

Approval of Resolution No. 26-1013 authorizing the 2026 Sidewalk Construction Project, PN 3-C-072-26.