Focus Area: Infrastructure (Engineering)
Staff Contact: Mary Jaeger / Nate Baldwin
Subject: Authorization of the BNSF West Track Separation Preliminary Engineering Project, PN 3-C-029-24.
________________________________________________________________________________
TITLE:
title
Consideration of Resolution No. 24-1008 authorizing the BNSF West Track Separation Preliminary Engineering Project, PN 3-C-029-24.
Body
________________________________________________________________________________
Summary:
88 trains per day utilize the western BNSF railroad tracks (Emporia Subdivision) in Olathe resulting in potential delays and unreliable travel time. This project will provide conceptual engineering of grade separated railroad crossings along the western BNSF railroad tracks to improve the reliability of east-west time travel in western Olathe.
Design is tentatively scheduled to begin in Spring 2024.
________________________________________________________________________________
Financial Impact:
Funding for the BNSF West Track Separation Preliminary Engineering Project, as approved in the 2024-2028 Capital Improvement Plan, includes:
GO Bonds $500,000
Total $500,000
________________________________________________________________________________
Action Needed:
Approval of Resolution No. 24-1008 authorizing the BNSF West Track Separation Preliminary Engineering Project, PN 3-C-029-24.
________________________________________________________________________________
Attachment(s):
A. Resolution