File #: G25-4816   
Type: Reports Status: Agenda Ready
File created: 12/19/2024 In control: City Council
On agenda: 1/7/2025 Final action:
Title: Report on the authorization of the 159th Street, Mur-Len to Black Bob, Improvements Project, PN 3-C-003-25.
Staff Contact: Mary Jaeger, Nate Baldwin
Attachments: 1. A. Project Location Map, 2. B. Project Fact Sheet, 3. C. CIP Sheet

Focus Area: Infrastructure (Engineering)

Staff Contact: Mary Jaeger / Nate Baldwin

Subject: Report on the authorization of the 159th Street, Mur-Len to Black Bob, Improvements Project, PN 3-C-003-25.

________________________________________________________________________________

TITLE:

title

Report on the authorization of the 159th Street, Mur-Len to Black Bob, Improvements Project, PN 3-C-003-25.

Body

________________________________________________________________________________

Summary:

This project is needed to address safety and capacity concerns in the area.  The project will improve 159th Street from 1,000’ west of Mur-Len to Black Bob Road from a 2-lane rural section to a 4-lane arterial with turn lanes.  Improvements will include pavement construction, curb and gutter, medians, streetlights, sidewalks, bike lanes, storm sewer, modifications to the existing stream crossing and a new traffic signal at 159th and Brougham.

 

The estimated cost for this project is $20,365,000 including preliminary and final design, utility relocations, staff time, land acquisition, permitting, construction and inspection.

 

This project is tentatively scheduled for design in 2025/2026, land acquisition and utility relocations in 2026, and construction in 2027.

________________________________________________________________________________

Financial Impact:

Funding for the 159th Street, Mur-Len to Black Bob, Improvements Project, as approved in the 2025-2029 Capital Improvement Plan, includes:                     

                     

GO Bonds                                                                                                         $20,365,000

Total                                                                                                    $20,365,000

 

________________________________________________________________________________

Action Needed:

No action requested at this time.  Staff will return to Council on January 21, 2025, to request approval for authorization of the project.