Title: Consideration of a Professional Services Agreement with TREKK Design Group, LLC for the Stormwater CCTV Inspection Project, PN 2-R-004-25.
Staff Contact: Mary Jaeger, Nate Baldwin
Attachments: 1. A. Agreement

Focus Area: Infrastructure (Engineering)

Staff Contact: Mary Jaeger / Nate Baldwin

Subject: Professional Services Agreement with TREKK Design Group, LLC for the Stormwater CCTV Inspection Project, PN 2-R-004-25.

________________________________________________________________________________

TITLE:

title

Consideration of a Professional Services Agreement with TREKK Design Group, LLC for the Stormwater CCTV Inspection Project, PN 2-R-004-25.

Body

________________________________________________________________________________

Summary:

The Stormwater Section is contracting with TREKK Design Group, LLC (TREKK) for the Stormwater CCTV Inspection Project.  This project will utilize closed-circuit television (CCTV) to inspect 120,000 linear feet of stormwater pipe. The project will focus on stormwater pipes along local and collector streets in residential neighborhoods.  Pipe condition data collected during this project will be used to plan for pipe replacement projects in residential neighborhoods. Condition data is also required for future pipe replacement funding applications. 

 

Professional services provided by TREKK will include stormwater pipe inspection and condition rating characterization.  Inspections will be conducted in accordance with Johnson County Stormwater Management Program (SMP) guidelines and NASSCO Pipeline Assessment Certification Program (PACP) coding standards.  TREKK will inspect the stormwater pipes and provide condition rating characterization for $497,794. Fifty percent of the total project cost will be provided by the Johnson County Stormwater Management Advisory Council (SMAC) program.

 

The project is scheduled to begin in Summer 2025.

 

________________________________________________________________________________

Financial Impact:

Funding for the Stormwater CCTV Inspection Project, includes:                     

 

JoCo SMAC Funding                                                                                    $      248,897

Olathe Stormwater Fund                                                                                    $      248,897

Total                                                                                                                                  $      497,794

 

________________________________________________________________________________

Action Needed:

Approval of a Professional Services Agreement with TREKK Design Group, LLC for the Stormwater CCTV Inspection Project, PN 2-R-004-25.

________________________________________________________________________________

Attachment(s):

A.                     Agreement