Focus Area: Infrastructure (Engineering)
Staff Contact: Mary Jaeger / Nate Baldwin
Subject: Authorization of the 2025 Sidewalk Construction Project, PN 3-C-072-25.
________________________________________________________________________________
TITLE:
title
Consideration of Resolution No. 25-1042 authorizing the 2025 Sidewalk Construction Project, PN 3-C-072-25.
Body
________________________________________________________________________________
Summary:
There are missing sidewalk links in older parts of the city, as well as adjacent to schools. The Sidewalk Construction Project is an annual project and will include the construction of new sidewalks that would not be built as part of a street improvement project.
Staff have utilized the available walking maps and met with the school district to prioritize the areas adjacent to schools that are missing sidewalk links. This evaluation took into consideration the number of crossing guards in the area, the percentage of students on free or reduced lunches, location of the school and the approximate lineal feet of sidewalk needed. Based on this information, the area that will be focused on in 2025 for construction of missing segments in the vicinity of Rolling Ridge Elementary, Central Elementary, and Ridgeview Elementary.
The construction of the sidewalks is tentatively scheduled to begin in Fall 2025.
________________________________________________________________________________
Financial Impact:
Funding for the 2025 Sidewalk Construction Project includes:
CIP Fund $ 5,000
GO Bonds $575,000
Total $580,000
________________________________________________________________________________
Action Needed:
Approval of Resolution No. 25-1042 authorizing the 2025 Sidewalk Construction Project, PN 3-C-072-25
________________________________________________________________________________
Attachment(s):
A. Resolution