Focus Area: Economy, Community Development
Staff Contact: Lauren Winter, Planner I
Subject: PR24-0017: Sign Package for Heartland Coca-Cola Campus; Applicant: David Brandt, Fravert Services
________________________________________________________________________________
TITLE:
title
Consideration of PR24-0017, requesting approval of a sign package for the Heartland Coca-Cola Bottling facility on 116.83± acres; located at 17100 Hedge Lane. Planning Commission recommends approval 6 to 0.Body
________________________________________________________________________________
Summary:
The applicant is requesting approval of a sign package for the Heartland Coca-Cola campus located southwest of W. 167th Street and Hedge Lane. This request is for signage only and there are no changes to the site layout or buildings from what is currently approved.
The Unified Development Ordinance (UDO) provides a mechanism for City Council to approve a sign package and exceptions from standard sign code. Sign packages can be appropriate for large developments with unique characteristics that the standard sign code may not adequately address. The Heartland Coca-Cola facility is unique as Heartland Coca-Cola is the single-user on a 116-acre campus that will consist of 1.1 million square feet of building area at full build out.
The proposed package includes a total of three (3) monument signs, one additional than typically permitted, and one (1) wall sign. Additionally, larger directional signs are proposed throughout the site to improve wayfinding for truck traffic. Staff recommends approval, and the Planning Commission voted 6-0 to recommend approval of PR24-0017 as stipulated.
________________________________________________________________________________
Financial Impact:
None
________________________________________________________________________________
Action Needed:
1. Approve the sign package for the Heartland Coca-Cola Bottling campus as recommended by the Planning Commission (majority vote of the Councilmembers present required).
2. Deny the sign package for the Heartland Coca-Cola Bottling campus (majority vote of the Councilmembers present required).
3. Return the sign package for the Heartland Coca-Cola Bottling facility to the Planning Commission for further consideration with a statement specifying the basis for the Governing Body’s failure to approve or disapprove (majority vote of the Councilmembers present required).
________________________________________________________________________________
Attachment(s):
A. Planning Commission Packet
B. Planning Commission Minutes