Legislation Details

File #: G26-5936   
Type: Council Consent Status: Agenda Ready
File created: 8/19/2026 In control: City Council
On agenda: 9/1/2026 Final action:
Title: Consideration of an Agreement with Infrastructure Solutions LLC for design-build services for the Cedar Creek Low Pressure Force Main, Phase 2 Project, PN 1-C-003-22.
Staff Contact: Mary Jaeger, Nate Baldwin
Attachments: 1. A. Project Location Map, 2. B. Project Fact Sheet, 3. C. DBIA Agreement

Focus Area: Infrastructure (Engineering)

Staff Contact: Mary Jaeger / Nate Baldwin

________________________________________________________________________________

title:

title

Consideration of an Agreement with Infrastructure Solutions LLC for design-build services for the Cedar Creek Low Pressure Force Main, Phase 2 Project, PN 1-C-003-22.

Body

________________________________________________________________________________

recommended motion:

Approve as part of the Consent Agenda.

________________________________________________________________________________

Summary:

Many of the existing low pressure force mains in the Cedar Creek area were constructed without adequate isolation valving to allow for maintenance of these mains without shutting a large number of residents out of sanitary sewer service.  Additionally, when breaks occur on these force mains, the lack of valving prevents the City’s utility maintenance crews from stopping flow into the mains while performing repairs.  This project will add additional isolation valving to resolve these issues.

 

A Request for Qualifications for Design-Build Services for design and construction of this project was released on April 11, 2025. Two (2) firms responded to this request and Infrastructure Solutions LLC was selected based on the submitted qualifications. The proposed agreement with Infrastructure Solutions, LLC is a Guaranteed Maximum Price package totaling $195,913.40 for construction of this project.

 

Construction of this project is tentatively scheduled to begin in September 2026 and should be completed by the end of November 2026.

________________________________________________________________________________

Financial Information:

Funding for the Cedar Creek Low Pressure Force Main Project includes:

 

                     Revenue Bonds                                                                                                                              $   160,000

Water & Sewer Fund                                                                                                         $   265,000

                     Total                                                                                                                                                                        $   425,000

________________________________________________________________________________

Attachment(s):

A. Project Location Map

B. Project Fact Sheet

C. DBIA Agreement