File #: G25-4980   
Type: Council Consent Status: Passed
File created: 3/7/2025 In control: City Council
On agenda: 3/18/2025 Final action: 3/18/2025
Title: Consideration of Engineer's Estimate, acceptance of bids and award of contract to Freeman Concrete Construction, LLC for construction of the 143rd Street Arterial Mill and Overlay Project, PN 3-P-002-25.
Staff Contact: Mary Jaeger, Nate Baldwin
Attachments: 1. A. Project Location Map, 2. B. Project Fact Sheet, 3. C. Construction Agreement, 4. D. Engineer's Estimate and Affidavit of Estimate

Focus Area: Infrastructure (Engineering)

Staff Contact: Mary Jaeger / Nate Baldwin

Subject: Contract with Freeman Concrete Construction, LLC for construction of the 143rd Street Arterial Mill and Overlay Project, PN 3-P-002-25

________________________________________________________________________________

TITLE:

title

Consideration of Engineer’s Estimate, acceptance of bids and award of contract to Freeman Concrete Construction, LLC for construction of the 143rd Street Arterial Mill and Overlay Project, PN 3-P-002-25.

Body

________________________________________________________________________________

Summary:

On March 4, 2025, three (3) bids were received and opened for the above referenced project. The bids ranged from $2,227,745.53 to $2,732,750.00 with the Engineer’s Estimate at $2,488,943.00. Freeman Concrete Construction, LLC submitted the low and responsible bid in the amount of $2,227,745.53. The following is a tabulation of the bids received:

 

Freeman Concrete Construction, LLC                                          $ 2,227,745.53

Engineer’s Estimate                                                                                                         $ 2,488,943.00

Phoenix Concrete, LLC                                                                                    $ 2,686,200.56

McAnany Construction, Inc.                                                               $ 2,732,750.00

 

This Street Preservation project will provide a 2” depth mill and asphalt on 143rd Street (Mur-Len Road to Black Bob Road) including base and subgrade repairs (as needed), concrete curb and sidewalk replacement, installation of ADA compliant sidewalk ramps, installation of 8’ wide shared use path, placement of pavement markings, stormwater improvements, installation of a rectangular rapid flashing beacon (RRFB) at the Blackfeather Street intersection, and signal detection replacement.

 

Construction is tentatively scheduled to begin in Spring 2025 and tentatively scheduled to be completed in Fall 2025.

________________________________________________________________________________

Financial Impact:

This project is funded from the City of Olathe’s 2025 Street Preservation Program. Funding for the 2025 Street Preservation Program, as approved in the 2025-2029 CIP, includes:

 

CIP Fund (Cash)                                                               $  2,800,000

Transportation Sales Tax                                          $18,470,000

Total:                                                                                                         $21,270,000

 

________________________________________________________________________________

Action Needed:

Approval of Engineer’s Estimate, acceptance of bids and award of contract to Freeman Concrete Construction, LLC for construction of the 143rd Street Arterial Mill and Overlay Project, PN 3-P-002-25.

________________________________________________________________________________

Attachment(s):

A. Project Location Map

B. Project Fact Sheet

C. Construction Agreement

D. Engineer’s Estimate and Affidavit of Estimate