Type: Council Consent Status: Agenda Ready
File created: 4/23/2025 In control: City Council
On agenda: 8/5/2025 Final action:
Title: Consideration of an Agreement with the Federal Railroad Administration for obligation of Railroad Crossing Elimination grant funds for the BNSF West Track Separation Preliminary Engineering Project, PN 3-C-029-24.
Staff Contact: Mary Jaeger, Nate Baldwin
Attachments: 1. A. Agreement

Focus Area: Infrastructure (Engineering)

Staff Contact: Mary Jaeger / Nate Baldwin

Subject: Agreement with the Federal Railroad Administration for obligation of Railroad Crossing Elimination grant funds for the BNSF West Track Separation Preliminary Engineering Project, PN 3-C-029-24.

________________________________________________________________________________

TITLE:

title

Consideration of an Agreement with the Federal Railroad Administration for obligation of Railroad Crossing Elimination grant funds for the BNSF West Track Separation Preliminary Engineering Project, PN 3-C-029-24.

Body

________________________________________________________________________________

Summary:

The City of Olathe is bisected by the BNSF Emporia Subdivision, which runs north and south at-grade through downtown Olathe.  There are eight at-grade crossings and one low clearance crossing of these railroad tracks, each presenting a unique set of challenges to the City and its residents.  The BNSF railroad tracks act as a major east-west barrier with the City, preventing the free flow of traffic and compounding safety issues for all modes of transportation.  This project will provide conceptual engineering of grade separated railroad crossings along these railroad tracks to improve the reliability of east-west travel time in western Olathe.

 

On January 10, 2025, the City of Olathe was notified that we were selected for an an award of $1,750,000 from the Federal Railroad Administration (FRA) under the Railroad Crossing Elimination (RCE) program for the BNSF West Track Separation Preliminary Engineering project. Since that time, City staff has met with the FRA to discuss the requirements associated with the grant. In order for funding obligation, the City must approve an Agreement with the FRA.

 

Preliminary engineering design is tentatively scheduled to begin in Fall 2025.

________________________________________________________________________________

Financial Impact:

Funding for the BNSF West Track Separation Preliminary Engineering Project, includes:

 

                                          GO Bonds                                                                                                         $   500,000

                                          RCE Grant                                                                                                         $1,750,000

                                          BNSF                                                                                                                              $   100,000

                                          Total                                                                                                                              $2,350,000

 

________________________________________________________________________________

Action Needed:

Approval of an Agreement with the Federal Railroad Administration for obligation of Railroad Crossing Elimination grant funds for the BNSF West Track Separation Preliminary Engineering Project, PN 3-C-029-24.