File #: G25-4861   
Type: Council Consent Status: Agenda Ready
File created: 1/10/2025 In control: City Council
On agenda: 1/21/2025 Final action:
Title: Consideration of Resolution No. 25-1006 authorizing the 2026 Street Reconstruction Program, 3-R-000-26.
Staff Contact: Mary Jaeger, Nate Baldwin
Attachments: 1. A. Project Location Map, 2. B. Resolution

Focus Area: Infrastructure (Engineering)

Staff Contact: Mary Jaeger / Nate Baldwin

Subject: Authorization of the 2026 Street Reconstruction Program, 3-R-000-26

________________________________________________________________________________

title:

title

Consideration of Resolution No. 25-1006 authorizing the 2026 Street Reconstruction Program, 3-R-000-26.

Body

________________________________________________________________________________

Summary:

The Street Reconstruction Program provides for full reconstruction of streets that are deteriorated to a condition beyond preventative maintenance provided by the Street Preservation Program.  The 2026 Street Reconstruction Program includes the following seven primary street locations and five alternate street locations:

 

S. Hamilton Circle, Harrison to Public Safety Drive

     Public Safety Drive, Hamilton Circle to Old 56 Highway

S. Chester Street, Santa Fe Street to Loula Street

E. Lakeview Avenue, Ridgeview Road to Central Street

E. Wabash Avenue, Ridgeview Road to Central Street

S. Hyer Street, Loula Street to Cedar Street

S. Emery Street, Park Street to Loula Street

W. 107th Street, from existing asphalt pavement to the west end

    cul-de-sac (Alternate)

W. Ashbury Street, Parker Street to Clinton Street (Alternate)

W. Fairwood Lane, Forest Drive to Clinton Street (Alternate)

N. Troost Street, Forest Drive to Layton Street (Alternate)

W. Woodside Drive, Troost Street to Clinton Street (Alternate)

 

Each location will include removing the existing pavement section, grading and placement of aggregate base subgrade, full depth asphalt pavement, concrete curb and gutter, concrete ADA ramps and sidewalks, drive approaches, and city streetlight installation.  The project locations may require utility rehabilitation where necessary, and could include waterline, sanitary sewer and stormwater improvements.

 

All the primary streets were included in Resolution 24-1005 for the 2025 Street Reconstruction Program. Construction in 2025 will include completion of both phases of the Hamilton Circle Improvement Project, which includes Hamilton Circle and Public Safety Drive from Harrison Street to Old 56 Highway. The alternate street locations will be designed and scheduled for construction depending on the available funding following the bidding of the primary street locations.

________________________________________________________________________________

Financial Impact:

Funding for the 2026 Street Reconstruction Program, as approved in the 2025-2029 CIP, includes:

 

GO Bonds                                                                                    $4,000,000

Total                                                                                                          $4,000,000

________________________________________________________________________________

Action Needed:

Approval of Resolution No. 25-1006 authorizing the 2026 Street Reconstruction Program, 3-R-000-26.