Type: Council Consent Status: Passed
File created: 12/16/2019 In control: City Council
On agenda: 1/7/2020 Final action: 1/7/2020
Title: Consideration of Resolution No. 20-1007 authorizing the 2020 Sidewalk Construction Project, PN 3-C-072-20
Staff Contact: Mary Jaeger, Beth Wright
Attachments: 1. A: Resolution, 2. B: Project Fact Sheet, 3. C: Project Location Map

Department: Public Works

Staff Contact: Mary Jaeger/Beth Wright

Subject: Authorization of the 2020 Sidewalk Construction Project, PN 3-C-072-20.

________________________________________________________________________________

Item Description:

title

Consideration of Resolution No. 20-1007 authorizing the 2020 Sidewalk Construction Project, PN 3-C-072-20..

Body

________________________________________________________________________________

Summary:

There are missing sidewalk links in older parts of the city, as well as adjacent to schools. The Sidewalk Construction Project is an annual project and will include the construction of new sidewalks that would not be built as part of a street improvement project.

 

Staff has utilized the available walking maps and met with the school district to prioritize the areas adjacent to schools that are missing sidewalk links.  This evaluation took into consideration the number of crossing guards in the area, the percent of students on free or reduced lunches, location of the school and the approximate lineal feet of sidewalk needed.  Based on this information, the areas that will be focused on in 2020 for construction are those adjacent to Central, Fairview, and Ridgeview Elementary Schools.

 

The construction of the sidewalks is tentatively scheduled to begin in Spring 2020.

 

________________________________________________________________________________

Financial Impact:

Funding for the 2020 Sidewalk Construction Project, as approved in the 2019 Capital Improvement Plan, includes:

 

                     GO Bonds                                                                                                         $400,000

                     Total                                                                                                                              $400,000

 

________________________________________________________________________________

Action Needed:

Approval of Resolution No. 20-1007 authorizing the 2020 Sidewalk Construction Project, PN 3-C-072-20.