Title: Consideration of Resolution No. 20-1018 authorizing a survey and description of land or interest to be condemned for the Mill Creek, Prairie to Cedar, Phase 1, Stormwater Improvements Project, PN 2-C-030-18.
Staff Contact: Mary Jaeger, Beth Wright, Ron Shaver
Attachments: 1. A: 2-C-030-18 Project Location Map, 2. B: 2-C-030-18 Eminent Domain Resolution

Department: Public Works & Legal

Staff Contact: Mary Jaeger / Beth Wright / Ron Shaver

Subject: Authorization of a survey for eminent domain for the Mill Creek, Prairie to Cedar, Phase 1, Stormwater Improvements Project, No. 2-C-030-18.

________________________________________________________________________________

Item Description:

title

Consideration of Resolution No. 20-1018 authorizing a survey and description of land or interest to be condemned for the Mill Creek, Prairie to Cedar, Phase 1, Stormwater Improvements Project, PN 2-C-030-18.

Body

________________________________________________________________________________

Summary:

Project No. 2-C-030-18 was created by Resolution No. 18-1075 on August 21, 2018.

 

This project will be the first phase of a project that through a combination of capital improvements and voluntary home buyouts will remove thirty-three (33) buildings from the FEMA regulated floodplain and minimize overtopping of Cherry, Prairie, Spruce, Poplar, Water, Woodland, Santa Fe, Park, and Loula Streets.  Phase 1 of this project will address street and structure flooding that occurs along Mill Creek north of Santa Fe and south of Mulberry Street.  The project location is shown on the attached Project Location Map (Attachment A).

 

This phase is the fourteenth (14th) of twenty (20) identified watershed flood control projects located in the FEMA regulated floodplain.

 

This phase of the project includes replacement of existing culverts with bridges at Chestnut, Spruce, and Poplar Streets, reconstruction of street pavement, channel deepening and widening, retaining walls, storm sewer improvements, and voluntary home buyouts.  It is anticipated that the maximum number of home buyouts will be four (4) out of the 33 buildings currently in the FEMA regulated floodplain.  

 

Right-of-Way and/or easements need to be acquired several tracts of land for the project. This resolution is the first step in the eminent domain process (Attachment B).

 

Staff will continue to negotiate with the property owners to try to reach agreements to acquire the property before using the eminent domain process.

________________________________________________________________________________

Financial Impact:

Funding for the Mill Creek, Prairie to Cedar, Phase 1, Stormwater Improvements Project includes:

 

                     Olathe Stormwater Fund                                                               $   390,000

                     Revenue Bonds (Stormwater)                                          $1,695,000

Johnson County SMAC Program                                          $4,200,000

                     Total                                                                                                                              $6,285,000

 

________________________________________________________________________________

Action Needed:

Approval of Resolution No. 20-1018 authorizing a survey and description of land or interest to be condemned for the Mill Creek, Prairie to Cedar, Phase 1, Stormwater Improvements Project, PN 2-C-030-18.

________________________________________________________________________________

Attachment(s):

A:  2-C-030-18 Project Location Map

B:  2-C-030-18 Eminent Domain Resolution