Department: Public Works
Staff Contact: Mary Jaeger / Beth Wright
Subject: Invoice from Wiedenmann, Inc. for Emergency Stormwater Pipe Replacement at 151st Street and South Mullen Street.
________________________________________________________________________________
Item Description:
title
Consideration of an Invoice from Wiedenmann, Inc. for Emergency Stormwater Pipe Replacement at 151st Street and South Mullen Street..
Body
________________________________________________________________________________
Summary:
On March 12, 2020, it was discovered that a large corrugated metal pipe (CMP) had failed under 151st Street, east of South Mullen Street, and the street was starting to settle. The City contacted Wiedenmann, Inc. to provide emergency stormwater pipe replacement under existing Price Agreement #17-4143. Work included traffic control, utility coordination/relocation, installation of a new 60-inch reinforced concrete pipe (RCP), street patching and repair, and restoration. Work was initiated on March 20th and was completed in 6 days.
The total cost for the emergency repair was $127,613.89.
_____________________________________________________________________________
Financial Impact:
The total amount of the invoice is $127,613.89, and will be charged to the Stormwater Improvement Project, PN 2-C-004-20.
________________________________________________________________________________
Action Needed:
Approval of an Invoice from Wiedenmann, Inc. for Emergency Stormwater Pipe Replacement at 151st Street and South Mullen Street.
________________________________________________________________________________
Attachment(s):
A. Invoice