Title: Consideration of Relocation Agreement with Evergy Kansas Central, Inc. for the Vertical Well Field Improvements Project, PN 5-C-031-18.
Staff Contact: Mary Jaeger, Beth Wright
Attachments: 1. A. Project Location Map, 2. B. Project Fact Sheet, 3. C. Relocation Agreement

Focus Area: Infrastructure (Engineering)

Staff Contact: Mary Jaeger / Beth Wright

Subject: Agreement with Evergy to relocate facilities for the Vertical Well Field Improvements Project, PN 5-C-031-18.

________________________________________________________________________________

Item Description:

title

Consideration of Relocation Agreement with Evergy Kansas Central, Inc. for the Vertical Well Field Improvements Project, PN 5-C-031-18.

Body

________________________________________________________________________________

Summary:

In 2019, a facility plan for the replacement of the City’s vertical well field was developed which identified new vertical well locations, provided a prioritized replacement schedule, and created a standard well construction design to be utilized for each replacement well site.

 

Design of the first phase of vertical well replacements was completed in 2020, which includes five new vertical wells and extensive upgrades to the energy distribution and backup power supply in the well field. Currently all vertical wells have their own dedicated overhead electric distribution lines providing power, with only Horizontal Collector Well (HCW-2) on emergency generator power. With this project, HCW-2 will become the centralized power hub for the entire well field. Power to the new vertical wells will be provided via buried duct banks from HCW-2. Not only will these lines be better protected from the elements, but they will also provide the new vertical wells with access to emergency power from the backup generator at HCW-2, increasing the City’s ability to still provide raw water to Water Treatment Plant #2 in case of an emergency.

 

This agreement is in place to reimburse Evergy Kansas Central, Inc. (Evergy) for deenergizing and removing portions of their overhead distribution lines in the southern half of the vertical well field which are to be abandoned with this project, as well as installing new overhead distribution power directly to HCW-2. The total cost of the reimbursement is $57,088.88.

 

Construction of Phase 1 of the Vertical Well Field Improvements Project is currently underway and is tentatively scheduled to be completed in Summer 2021.

________________________________________________________________________________

Financial Impact:

The funding for the Vertical Well Field Improvements Project, as approved in the 2021-2025 Capital Improvement Plan, includes:

Revenue Bonds                                                               $4,958,039

SDF Funds                                                                                    $1,219,686

Cash                                                                                    $   235,520

Total                                                                                     $6,413,245

________________________________________________________________________________

Action Needed:

Approval of a Relocation Agreement with Evergy Kansas Central, Inc. for the Vertical Well Field Improvements Project, PN 5-C-031-18.