File #: G21-2182   
Type: Council Consent Status: Agenda Ready
File created: 2/16/2021 In control: City Council
On agenda: 3/2/2021 Final action:
Title: Consideration of an Agreement with Johnson County for design of the Stagecoach and Sleepy Hollow Stormwater Improvements Project, PN 2-C-011-20.
Staff Contact: Mary Jaeger, Beth Wright
Attachments: 1. A. Project Location Map, 2. B. Project Fact Sheet, 3. C. Agreement

FOCUS AREA: Infrastructure (Engineering)

Staff Contact: Mary Jaeger / Beth Wright

Subject: Agreement with Johnson County for funding the design of the Stagecoach and Sleepy Hollow Stormwater Improvements Project, PN 2-C-011-20.

________________________________________________________________________________

Item Description: Consideration of an Agreement with Johnson County for design of the Stagecoach and Sleepy Hollow Stormwater Improvements Project, PN 2-C-011-20..

________________________________________________________________________________

Summary:

 

On February 2, 2021, City Council approved a Professional Services Agreement with Affinis Corp., for design services for the Stagecoach and Sleepy Hollow Stormwater Improvements Project.  This project is in place to address street and structure flooding in the vicinity of Stagecoach Drive and Sleepy Hollow Drive and will include replacing corrugated metal pipe (CMP) along the main trunkline with larger concrete or plastic pipe, adding additional stormwater inlets, and upsizing existing inlets in the project area.

 

This project was chosen to be funded by Johnson County’s Stormwater Management Advisory Council (SMAC) program in the amount of $227,752.50 (75% of $303,670) for design of the project.  In order to accept this funding, the City must approve an Agreement with Johnson County.  The SMAC program will also participate in funding 75% of eligible construction costs, which will be brought before City Council as a future Agreement.

 

This is the third of six identified neighborhood flood control projects located outside the FEMA regulated floodplain.

 

The project is scheduled to begin design in Spring 2021, with construction tentatively scheduled to begin in Summer 2022.

 

 

______________________________________________________________________

Financial Impact:

Funding for the Stagecoach and Sleepy Hollow Stormwater Improvements Project includes:

 

JoCo SMAC Funding                                                                                    $ 1,447,500

Olathe Stormwater Fund                                                                                    $    287,500

Revenue Bonds                                                                                                         $ 1,000,000

Total                                                                                                                                  $ 2,735,000

 

________________________________________________________________________________

Action Needed:

Approval of an Agreement with Johnson County for design of the Stagecoach and Sleepy Hollow Stormwater Improvements Project, PN 2-C-011-20.

________________________________________________________________________________

Attachment(s):

A.                     Project Location Map

B.                     Project Fact Sheet

C.                     Agreement