Type: Council Consent Status: Passed
File created: 3/1/2021 In control: City Council
On agenda: 3/16/2021 Final action: 3/16/2021
Title: Consideration of an Inter-local Agreement with the City of Overland Park for construction of the Pflumm Road Bridge Maintenance Project, PN 3-G-001-21
Staff Contact: Mary Jaeger, Beth Wright
Attachments: 1. A. Project Location Map, 2. B. Inter-Local Agreement, 3. C. Resolution 21-1007

focus area: Infrastructure (Engineering)

Staff Contact: Mary Jaeger / Beth Wright

Subject: Inter-Local Agreement with the City of Overland Park for the Pflumm Road Bridge Maintenance Project, PN 3-G-001-21.

________________________________________________________________________________

Item Description:

title

Consideration of an Inter-local Agreement with the City of Overland Park for construction of the Pflumm Road Bridge Maintenance Project, PN 3-G-001-21..

Body

________________________________________________________________________________

Summary:

The City of Overland Park, Kansas is performing maintenance of a bridge on Pflumm Road north of 143rd Street.  Maintenance includes replacing the expansion joints and installing a polymer concrete overlay to the bridge deck, which will protect it from the infiltration of deicing salts and reduce long-term maintenance costs. The City of Overland Park contacted the City of Olathe Engineering department to request a cost share project earlier this year.

 

The Agreement identifies a total project cost of $113,300 to be split between the City of Olathe and the City of Overland Park according maintenance needs on each of the bridges (Olathe is responsible for maintenance on the southbound bridge; Overland Park is responsible for the maintenance on the northbound bridge).  The Olathe share of the project is 55% of the total project cost, totaling an estimated $62,400.  Administration of the project will be provided by Overland Park.

 

Reimbursement will be made to the City of Overland Park upon satisfactory completion of the project.  The total cost of the reimbursement is available from the City of Olathe’s 2021 Structures Repair Project, which was authorized by City Council on January 19, 2021.

 

This project is scheduled to be completed in Summer 2021.

________________________________________________________________________________

Financial Impact:

This project is funded from the City of Olathe’s 2021 Structures Repair Project, PN 3-G-000-21, authorized on January 19, 2021.  Funding includes:

 

                     GO Bonds                                                                                                         $250,000

                     

________________________________________________________________________________

Action Needed:

Approval of an Inter-local Agreement with the City of Overland Park for construction of the Pflumm Road Bridge Maintenance Project, PN 3-G-001-21.

________________________________________________________________________________

Attachment(s):

A.                     Project Location Map

B.                     Inter-Local Agreement

C.                     Resolution 21-1007