FOCUS AREA: Infrastructure (Engineering)
Staff Contact: Mary Jaeger / Beth Wright
Subject: Contract with Kansas Heavy Construction, LLC for construction of the Upper Cedar Creek Stormwater Improvements Project, PN 2-C-013-19.
________________________________________________________________________________
Item Description:
title
Consideration of Engineer’s Estimate, acceptance of bids and award of contract to Kansas Heavy Construction, LLC for construction of the Upper Cedar Creek Stormwater Improvements Project, PN 2-C-013-19..
________________________________________________________________________________
Summary:
On March 15, 2021, five (5) bids were received and opened for the above referenced project. The bids ranged from $1,522,327.00 to $1,812,752.00 with the Engineer’s Estimate at $1,502,616.00. Kansas Heavy Construction, LLC submitted the low and responsible bid in the amount of $1,522,327.00. The following is a tabulation of the bids received:
Engineer’s Estimate $1,502,616.00
Kansas Heavy Construction, LLC $1,522,327.00
Linaweaver Construction, Inc. $1,555,657.25
VF Anderson Builders, LLC $1,571,597.00
Wiedenmann, Inc. $1,735,977.00
Infrastructure Solutions, LLC $1,812,752.00
This project includes replacement of existing corrugated metal pipe (CMP) culverts with larger concrete culverts, reconstruction of street pavement, channel improvements, storm sewer improvements, and the reduction of the flood risk for two (2) businesses identified within the 100-year floodplain through project improvements.
This is the second of six identified neighborhood flood control projects located outside the FEMA regulated floodplain.
Construction is tentatively scheduled to begin in Spring 2021 with completion in Fall 2021.
________________________________________________________________________________
Financial Impact:
Funding for the Upper Cedar Creek Stormwater Improvements Project includes:
Johnson County SMAC Program $1,350,570
Olathe Stormwater Funds $1,184,430
Total $2,535,000
________________________________________________________________________________
Action Needed:
Approval of Engineer’s Estimate, acceptance of bids and award of contract to Kansas Heavy Construction, LLC for construction of the Upper Cedar Creek Stormwater Improvements Project, PN 2-C-013-19.
________________________________________________________________________________
Attachment(s):
A. Project Location Map
B. Project Fact Sheet
C. Engineer’s Estimate and Affidavit of Estimate