City of Olathe header
To visit archives prior to April 2024 please click here.
File #: G21-2354   
Type: Special Business Status: Agenda Ready
File created: 5/7/2021 In control: City Council
On agenda: 5/18/2021 Final action:
Title: Discussion on navigating the new continuous flow turn lanes on the Lone Elm Road, Old 56 Hwy to 151st Street, Improvements Project, PN 3-C-084-17
Staff Contact: Mary Jaeger, Nate Baldwin

focus area: Infrastructure (Engineering)

Staff Contact: Mary Jaeger / Nate Baldwin

Subject: Presentation on navigating the new continuous flow turn lanes on the Lone Elm Road, Old 56 Hwy to 151st Street, Improvements Project, PN 3-C-084-17.

________________________________________________________________________________

Item Description:

title

Discussion on navigating the new continuous flow turn lanes on the Lone Elm Road, Old 56 Hwy to 151st Street, Improvements Project, PN 3-C-084-17..

Body

________________________________________________________________________________

Summary:

This project improves Lone Elm Road to a four-lane divided arterial section between Old 56 Highway and 151st Street along with geometric improvements at the intersection of Lone Elm Road and Old 56 Highway.  Improvements will include storm sewer, streetlights, on-street bike lanes, landscaping and sidewalks.  Also included in this project are modifications to the existing bridge over the railroad to provide pedestrian access.

 

Improvements to the intersection of Old 56 Highway and Lone Elm Road include continuous flow (also commonly referred to by other transportation agencies as ‘displaced’) left-turn lanes eastbound and westbound from Old 56 Highway to Lone Elm Road.  The intersection is tentatively scheduled to open to traffic (weather dependent) on June 1, 2021.  These will be the first continuous flow turn lanes and intersection of this type in the state of Kansas.  So staff worked with the design engineer, HDR Engineering, to develop a video on how to navigate the intersection to assist with public education on how to navigate the new improvements.

________________________________________________________________________________

Financial Impact:

Funding for the Lone Elm Road, Old 56 Hwy to 151st, Improvements Project includes:

 

                                          General Obligation Bonds                                                                                    $13,175,000

                                          STP (Federal)                                                                                                          $  3,785,000

                                          CARS                                                                                                                                                   $  2,500,000

                                           Total                                                                                                                                                   $19,460,000

________________________________________________________________________________

Action Needed:

For information only. There is no action requested from the Council at this time.

________________________________________________________________________________

Attachment(s):

None