File #: G24-4186   
Type: Council Consent Status: Passed
File created: 1/10/2024 In control: City Council
On agenda: 1/23/2024 Final action: 1/23/2024
Title: Consideration of Engineer's Estimate, acceptance of bids and award of contract to Capital Electric Line Builders, LLC for construction of the Pedestrian Crossing Improvements for 147th Street and Pflumm Road, PN 3-C-114-20.
Staff Contact: Mary Jaeger, Nate Baldwin
Attachments: 1. A. Project Location Map, 2. B. Project Fact Sheet, 3. C. Engineer's Estimate and Affidavit of Estimate, 4. D. Construction Agreement

Focus Area: Infrastructure (Engineering)

Staff Contact: Mary Jaeger / Nate Baldwin

Subject: Contract with Capital Electric Line Builders, LLC for construction of the Pedestrian Crossing Improvements for 147th Street and Pflumm Road, PN 3-C-114-20.

________________________________________________________________________________

TITLE:

title

Consideration of Engineer’s Estimate, acceptance of bids and award of contract to Capital Electric Line Builders, LLC for construction of the Pedestrian Crossing Improvements for 147th Street and Pflumm Road, PN 3-C-114-20.

Body

________________________________________________________________________________

Summary:

During design of the Pflumm Road, 143rd to 151st, Improvements project, it was determined that there was a need for a signalized pedestrian crossing to be installed on Pflumm at 147th Street.  Because of the federal funding associated with the Pflumm Road project, the signalized pedestrian crossing could not be installed with the construction of the Pflumm improvements.  As such, this portion of the project was bid after completion of the Pflumm improvements project.  This signal will only be activated when the crossing button is pushed.

 

On December 18, 2023, four (4) bids were received and opened for the above referenced project. The bids ranged from $212,281.60 to $253,505.00 with the Engineer’s Estimate at $160,440.00. Capital Electric Line Builders, LLC submitted the low and responsible bid in the amount of $212,281.60. The following is a tabulation of the bids received:

 

Engineer’s Estimate                                                                                                                                      $160,440.00

Capital Electric Line Builders, LLC                                                                       $212,281.60

Total Electric                     Contractors, Inc.                                                                                                    $213,674.00

Custom Lighting Services, LLC                                                                                  $220,736.86

Wildcat Construction Co., Inc.                                                                                            $253,505.00

 

Construction is tentatively scheduled to begin in Summer 2024 with completion in Winter 2024.

________________________________________________________________________________

Financial Impact:

Funding for the Pedestrian Crossing Improvements for 147th Street and Pflumm Road is from the Pflumm Road, 143rd to 151st, Improvements Project.  Funding for the Pflumm Road, 143rd to 151st, Improvements Project includes:

 

                                          CARS                                                                                                                              $  2,000,000

                                          Fed-STP                                                                                                         $  1,500,000                                                               

GO Bonds                                                                                                         $15,215,000

Total                                                                                                    $18,715,000

 

 

 

________________________________________________________________________________

Action Needed:

Approval of Engineer’s Estimate, acceptance of bids and award of contract to Capital Electric Line Builders, LLC for construction of the Pedestrian Crossing Improvements for 147th Street and Pflumm Road, PN 3-C-114-20.

________________________________________________________________________________

Attachment(s):

A.                     Project Location Map

B.                     Project Fact Sheet

C.                     Engineer’s Estimate and Affidavit of Estimate

D.                     Construction Agreement